1. Pre-Construction Planning
-
Review electrical designs and single-line diagrams for WtE plant components (e.g., incinerators, boilers, turbines, flue gas treatment systems).
-
Collaborate with engineers to ensure compliance with BS 7671 (18th Edition Wiring Regulations) and BS EN 61439 (low-voltage switchgear).
-
Develop method statements and risk assessments for high-risk tasks (e.g., HV cable installations, confined space work).
Skills & Qualifications
- Mandatory Certifications:
-
SSSTS (Site Supervisor Safety Training Scheme) or SMSTS (Site Management Safety Training Scheme).
-
CSCS Gold Card (Supervisor) or Black Card (Manager).
-
NVQ Level 3 in Electrical Installations or HNC/HND in Electrical Engineering.
-
18th Edition Wiring Regulations (BS 7671).